And now! New step from CIM SA:
ASIDASH cement 40 high heart resistance
Fields of usage:
-Pavements of air ports
-Bridges
-dams of additional cannels
-Car roads or paved roads.
-Mines
-Engineering contract
-System of irrigating and tapping cannels.
-Industrial pots.
-Heat high resistance industry
-Stoves and ovens
-Fields of maintenance, fixing, and non-penetrating of water.
-Filling dividers and pillars of doors and widows
-Gathering pipes.
Specification
-High heat resistance
-Anti-freezing resistance.
-Ability of pouring out until 10°C.
-High resistance for head and fire to 1300°C using limes.
-Hugh resistance for sea water and sulfuric water.
-High resistance for acids medias.
- High resistance for industrial trash and dirty water filled
with bacteria.
- High resistance for filtrated water
Stickers ( Ceramic and slab stickers)
Definition: It is a mixture for sticking with cement structure
to be easy to be applied the mix Turing material Bal Palymour
(chemical)
Places of usage:
It can be used in internal and external places to stick ceramic,
porcelain, shining mosaic, marble and natural stones.
Way of using:
Pour one packet of the sticker( 25kg) to 8 liters of water and
mix it well to have the proper shape. Wait for 5 minutes, then
stir the mixture to be ready to be used. Preparing the roof and
specification of application:
-The roof should be clean, level and without any of painting
remains and (………..)
-All cracks and gaps out the roof should be filled with(……..)
-The roof should be wet enough before applying.
-It is not allowed to be applied under sun shines.
-The sticker can be used only within 3 hours after the mixing.
-After 20-30 minuets of cleaning the roof, we can apply the
sticker regarding the climate conditions and the temperature
- Leveling should be done within 20 minutes at most.
Technical specifications:
Color
- Grey
Dimensions of one grain - 0.8
mm
Percentage of mixing -
30 water
The age of the pot prepared for application - 5 hours
Temperature during the application - 5-35°C
The applied thickness -
6 mm at most
Period of forming the cover - 30
minutes
Sticking
strength - 0.5
N/mm²
The amount used
- 4-6 kg/m²
Period of using the roof -
48 hours
Packing
- 25kg
Expiry
date -
12 months to be kept in
Dry place and classified
On 10 stories.